Pine
| Criteria | Criteria Required? |
|---|---|
| Import Permit | Yes |
| Phytosanitary Certificate | Yes |
| Additional Declaration/Endorsement | No |
| Protocol Market | No |
Note: This Micor case applies only to import permits where the product name is listed as 'Pine' with no scientific name.
For heat treatment core temperature of logs must be maintained at or above 56 degrees Celsius for a minimum of 30 minutes.
Treatment time does not commence until the temperature in the chamber has stabilized and the core temperature of the logs has reached a minimum of 56 degrees Celsius;
OR
Methyl bromide at:
- 21 degrees Celsius or above at 48 grm/m3 for 24 continuous hours; OR
- 16-20 degrees Celsius or above at 56 grm/m3 for 24 continuous hours; OR
- 11-15 degrees Celsius or above at 64 grm/m3 for 24 continuous hours;
OR
- Sulphuryl fluoride at 64 grm/m3 at 21 degree Celsius for 24 continuous hours at NAP or above;
Ethylene oxide under initial minimum vacuum of 50 kilopascals at the following rates:
- 1200 grm/m3 at 50 degree Celsius for 5 continuous hours; OR
- 1500 grm/m3 for 4 hours at 50 degree Celsius; OR
- 1500 grm/m3 for 24 continuous hours at 21 degree Celsius;
- Phosphine at 5 grm/m3 for 120 hours.
Import permit dated 03 March 2022.
03/08/2023 - Updated treatment requirements to specify that in-transit fumigation is subject to approval of in-hold fumigation plan by GSEP for each fumigation event.
01/06/2022 - Created case based on NPPO requirements.