Eucalyptus globulus
Country
Malaysia (MY)
Group
Logs
End use
Processing
NPPO Details
Plant Biosecurity Division, Department of Agriculture Malaysia
Relevant Web Addresses
| Criteria | Criteria Required? |
|---|---|
| Import Permit | Yes |
| Phytosanitary Certificate | Yes |
| Additional Declaration/Endorsement | Yes |
| Protocol Market | No |
All logs must be debarked before export to Malaysia.
Endorsement 5502:
Visual inspection by Authorised Officer is sufficient to endorse freedom from live insects.
For heat treatment core temperature of timber must be maintained at or above 56 degrees Celsius for a minimum of 30 minutes;
OR
Treatment time does not commence until the temperature in the chamber has stabilized and the core temperature of the timber has reached a minimum of 56 degrees Celsius;
All the sawn timber must undergo fumigation with one of the following:
Methyl bromide at:
The timber must be separated by a minimum 5mm of air space every 200mm;
OR
Sulphuryl fluoride at 64 grm/m3 at 21 degree Celsius for 24 continuous hours at NAP or above;
OR
Ethylene oxide under initial minimum vacuum of 50 kilopascals at the following rates:
OR
Treatment time does not commence until the temperature in the chamber has stabilized and the core temperature of the timber has reached a minimum of 56 degrees Celsius;
All the sawn timber must undergo fumigation with one of the following:
Methyl bromide at:
- 21 degrees Celsius or above at 48 grm/m3 for 24 continuous hours;
OR
- 16-20 degrees Celsius or above at 56 grm/m3 for 24 continuous hours;
OR
- 11-15 degrees Celsius or above at 64 grm/m3 for 24 continuous hours;
The timber must be separated by a minimum 5mm of air space every 200mm;
OR
Sulphuryl fluoride at 64 grm/m3 at 21 degree Celsius for 24 continuous hours at NAP or above;
OR
Ethylene oxide under initial minimum vacuum of 50 kilopascals at the following rates:
- 1200 grm/m3 at 50 degree Celsius for 5 continuous hours;
OR
- 1500 grm/m3 for 4 hours at 50 degree Celsius;
OR
- 1500 grm/m3 for 24 continuous hours at 21 degree Celsius;
OR
- Phosphine at 5 grm/m3 for 120 hours.
Option 1 (EXDOC Endorsement 5502)
1) Using official inspection and testing procedures the consignment was found free of live insects.
1) Using official inspection and testing procedures the consignment was found free of live insects.
Import permit dated 17December 2018.
04/02/2025 - Updated general requirements due to legislation changes.
27/07/2023 - Updated treatment requirements to specify that in-transit fumigation is subject to approval of in-hold fumigation plan by GSEP for each fumigation event.
10/11/2021 - Updated general requirements due to legislation changes.
27/07/2023 - Updated treatment requirements to specify that in-transit fumigation is subject to approval of in-hold fumigation plan by GSEP for each fumigation event.
10/11/2021 - Updated general requirements due to legislation changes.
Initial Uploaded: 19/12/2018
Reviewed Uploaded: 18/07/2026